Upgrade of National Route N2 Sections 12 and 13 from Nanaga Interchange at km 10.0 to Komgha River at km 10.3, Port Elizabeth, Eastern Cape. The exact co-ordinates are currently not available however the approximate area of location is Nanaga, 33°35'59.3"S 25°57'00.0"E .
Construction of the World Trade Centre Hospital located on plot L.R. No. 24861/1 (Nairobi Block 149/1351), Ngong Road, Nairobi, Kenya. The proposed project will involve demolition of the existing infrastructure and construction of the multi-speciality hospital with a bed capacity of 150. The total estimated
Construction of the highest residential building in Kampala with full amenities on 1 Katonga Road, Kampala, Uganda. Scope of works could include: construction of 24 floors and three basements. It will be made up of 306 condominiums, including studio, one-bedroom and two-bedroom apartments. GPS coordinates
Construction of the single level Cotswold Square Shopping Centre in Inanda Road, Hillcrest, in KwaZulu-Natal. Approximate GPS Coordinates: -29.757826,30.795582.
Resurfacing of National Route N11 Section 6 from Amersfoort at km 0.0 to Vaal River at km 27.6, Dr Pixley ka Isaka Seme Local Municipality, Gert Sibande District Municipality in Mpumalanga. The exact GPS location is not known, the GPS marker has been placed along the N11 in Amersfoort 26°59'50.8"S 29°52'07.5"E
Construction of SANRAL Eastern Region Office Building on Erf 10 000 in Pietermaritzburg, KwaZulu-Natal. The scope of work comprises a multi-storey office building including all appurtenant works required to make it a fully functional office building, providing amongst others, building works, site works,
Construction of the Orthodox Towers in Kilimani, Kenya. The building complex consists of two buildings, building A and building B that have common four floors for parking spaces. Building A is 93m high and consists of 22 floors including four parking floors. Building B is 61m high and includes 14 floors
Construction of a road, George Western Bypass Road, linking the Outeniqua Pass to the National Road (N2), effectively avoiding the central part of George, in the Western Cape, and reducing traffic volumes in the town. The exact co-ordinates are currently not available however the possible area of location
Renovation and expansion of the Setsong Tea Processing Facility situated at Setsong Tea Crafters which is on portion 811 of the Farm Loskop Noord 12 JS, Matlala Ramoshebo Village, Roedtan, Marblehall, Limpopo. The intended size of the facility will be 730m² and will involve processes such as grouping
Construction and expansion of the existing Nexus storage facility for agricultural chemicals, the site is located within the industrial area of northern Paarl, between Oosbosch Street and Distillery Street, on 2 Distillery Street, Charleston Hillon, Erf 19134, Paarl, Drakenstein Local Municipality, Western