You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 1037 items with Total of 1056 results

Advertising



Projects

Luphindo SSS
318
  • 21226
Construction of the Luphindo Senior Secondary School located in Maluti, Eastern Cape. The project value is R 54 337 597,95. The exact GPS co-ordinates are 30°28'14.8"S 28°38'49.4"E.


Projects

Maluti Magistrates Court Renovations
144
  • 35235
Maintenance, reconfiguration and upgrades to Maluti Magistrates Court on erf 138 located in Maluti, Eastern Cape. CIDB 7GB. The scope of works includes: Block A (Magistrate Court Building) - Repairs and renovations including reconfiguration and upgrades, Block B (Garages) - Repairs and renovations. Block


Projects

Maluti Ramohlakoana BWS Phase 2, Contract 3
123
  • 34563
Construction of the Maluti Ramohlakoana bulk water supply, Phase 2, Contract 3, in Matatiele, Eastern Cape. CIDB 7CE. Scope of works: construction and connection of 5Ml reinforced concrete reservoir including all relevant accessories such as inlets pipes, outlets pipes and valves, scour pipes and valves,


Projects

Motherwell Wind Energy Facility - Phase 2
227
  • 18930
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution


Projects

Zalu Dam
360
  • 16237
Construction of the Zalu Dam on Xura River near Lusikisiki, in the Eastern Cape Province.


Projects

Ntamonde Police Station
370
  • 13946
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E


Projects

N2 Section 20 Msikaba Bridge to Mtentu Bridge
206
  • 26267
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S


Projects

Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56
248
  • 10504
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes


Projects

R72 Section 4 and MR501 Intersection, Kidds Beach
98
  • 28848
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.


Projects

Moyeni Police Station
743
  • 10741
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.

Advertising

Send me a Sample Based on these search results