Construction of the Luphindo Senior Secondary School located in Maluti, Eastern Cape. The project value is R 54 337 597,95. The exact GPS co-ordinates are 30°28'14.8"S 28°38'49.4"E.
Maintenance, reconfiguration and upgrades to Maluti Magistrates Court on erf 138 located in Maluti, Eastern Cape. CIDB 7GB. The scope of works includes: Block A (Magistrate Court Building) - Repairs and renovations including reconfiguration and upgrades, Block B (Garages) - Repairs and renovations. Block
Construction of the Maluti Ramohlakoana bulk water supply, Phase 2, Contract 3, in Matatiele, Eastern Cape. CIDB 7CE. Scope of works: construction and connection of 5Ml reinforced concrete reservoir including all relevant accessories such as inlets pipes, outlets pipes and valves, scour pipes and valves,
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.