Eastern Plats is planning to develop an openpit mine at the facility, which is located on the eastern limb of the Bushveld Complex in Limpopo. To be known as the Mareesburg Project. The proposed development at the Mareesburg open-pit mine would increase the company's annual production to about 325,000oz
Construction of the bulk potable water distribution infrastructure and its associated appurtenant works from Splitskop to Mototolo, under Lebalelo Water User Association, Limpopo. CIDB 7CE. The scope of works includes the design and construction of the bulk potable water distribution infrastructure
Construction of storm water canal Phase 2 in Polokwane, at Seshego, Polokwane Municipality, Limpopo. For the value of R34 713 360.36. The scope of works could include: upgrade the existing open drainage system and replace it with an underground storm water conduit as well as provision of street lighting
Development and construction of a 35 MW solar plant at or adjacent to the mine that will power Sedibelo's mining operations in the North West province. The GPS coordinates have been placed at the Pilanesberg Platinum Mine, lat: -25.1058397; long: 26.988417
Construction of The Oaks Shopping Centre located on portion 11 of the Farm “The Oaks” No. 198-KT, Diphuti Village, corner of Morupu Mmola Road and R36, Maruleng, Limpopo. The development cost is estimated at a value of R200 million. The construction area is approximately 10 890m² and the scope of work
Construction, infrastructure maintenance, repairs of buildings, civil, mechanical, electrical and installations at Pontdrift, Platjan and Zanzibar Land Port of entry in Limpopo. CIDB 7CE/GB. The GPS marker has been placed at Zanzibar Land Port of entry 22°34'29.7"S 28°28'06.1"E
Improvement on National Road R578 Section 1 from Nwamatatani from km 56.0 to R81 at km 90.7 in Limpopo province, in the Greater Giyani local municipality. The exact co-ordinates are currently not available however the approximate area of location is 23°20'12.1"S 30°39'54.3"E
The proposed project will involve opencast and underground mining operations to take place on Portion 1 of the farm Zoedveld 294 KR and portions 4,5 and 18 of the farm Grasvally 293 KR. Reclamation of the existing residue deposits and waste rock dumps will also take place where feasible on site. The
Construction, supply and installation of a solar system, waste water facility and related civil works at the Pafuri Land Port of Entry at Pafuri, located inside the Kruger National Park, Limpopo. Award value: R50 829 781.18. The GPS location is 22°26'53.33"S 31°18'49.49"E.
Upgrades to existing Matsobane Primary School, Mphahlele, Capricorn District, Limpopo. R34 982 999.96. Scope of works could include: Demolitions of existing dilapidated blocks (E, G, H, I, J, K); renovations of toilets, classrooms and hall, construction of 2 x 4 classroom block, 2 x 2 Grade R classroom