Construction of a new Toyota Facility located at 8 Joyner road, Prospecton, KwaZulu-Natal. The GPS marker has been placed at the site 29°59'34.7"S 30°56'19.8"E
Construction of a private medical facility or tertiary facility in the Upper Highway area in KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of location is lat: -29.7785344; long: 30.8326663
Routine road maintenance of National Route 2 section 23 from km 44.48 to National Route 2 Section 27 at km 1.85 and National Route 3 Section 1 from km 8.56 to National Route 3 Section 4 at km 1.60 between Durban and Pietermaritzburg, KwaZulu-Natal. Estimated value of R297 300 632,49
Upgrade of 11.1km on National Route 3, from Mariannhill Toll Plaza Section 1 at km 25.0 to Key Ridge Section 2 at km 2.8. This project is in the province of Kwazulu-Natal and in the eThekwini Metro Municipality. CIDB 9CE. Approximate GPS location is 29°49'22.0"S 30°48'08.9"E
Upgrading of National Route N2 section 25 from Edwin Swales interchange from km 11.8 to south of EB Cloete interchange at km 16.0, KwaZulu-Natal in the eThekwini Metro Municipality. CIDB 9CE. The exact co-ordinates are currently not available however the approximate area of location is: -29.898738, 30.97611
Upgrade of National Route 3, Section 1, between Paradise Valley from km 17.5 to Mariannhill Toll Plaza at km 25.00 in the province of KwaZulu-Natal, Ethekwini Metropolitan area. CIBD 9CE. The GPS coordinates have been temporarily placed at a general location along the N3 in Paradise Valley until the
Construction of residential units for Precinct 2 of the Ridgeside Development. This precinct is to be situated adjacent to The Manors (medium-density buildings 2/3 storeys high plus higher density buildings and mixed-use buildings along the main boulevard) and below the commercial office precinct (medium-density
The eThekwini Municipality proposes to develop a wind farm, as part of the eThekwini Wind Repowering Project, on one or two identified sites, namely the University of KwaZulu-Natal (Westville Campus) and Langafontein Farm, approximately 2.2 km south east of the Inanda dam wall. The turbines that were
Realignment of the N3 Section 2 from Key Ridge from km 2.8 to Hammersdale at km 8.825 in KwaZulu-Natal, eThekwini Metro area. Value: R4 578 593 273.17. The GPS coordinates have been placed at the starting point -29.786622, 30.718572
Upgrading of National Route 2 section 25 from Isipingo Interchange (km 0.75 ) to Edwin Swales Interchange (km 12.08). This project is in the province of KwaZulu-Natal and in the district municipality of eThekwini Metropolitan. The exact co-ordinates are currently not available however the approximate