Construction of the San Kraal 390 MW wind energy facility (WEF) and its associated infrastructure located approximately six kilometres south east of the town of Noupoort in the Umsobomvu Local Municipality (ULM) which forms part of the Pixley ka Seme District in the Northern Cape Province. The proposed
Periodic maintenance of the National Route 9 Section 7 from Carlton Heights at km 24.50 to Noupoort at km 44.00 in the Northern Cape. The contract value is R 70 635 991,44. The exact co-ordinates are currently not available however the approximate area of location is Carlton Heights 31°17'25.0"S 24°56'57.0"E
Periodic maintenance on the National Route 10 Section 5 from Leuwekop at km 20.00 to Luipertskop at km 40.00 in the Northern Cape. The project value is R 69 873 408,03. The GPS co-ordinates have been placed along the proposed construction area on the N10 31°15'28.9"S 24°45'09.7"E.
The Wouterspan project is located opposite Rockswell's Saxendrift diamond mine, on the Orange river and is central to Rockwell's strategy to process 500 000 m³/m of high quality gravels from the middle Orange River region. The property has estimated inferred resources of 37.77 million cubic meters and
Establishment of the Naauw Poort Solar Energy Facility, a commercial photovoltaic solar energy facility (75 MW) on a site approximately 10km south of Noupoort, in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is 31°11'52.6"S 24°56'48.8"E.
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Establishment of the Dida Solar Energy Facility. The facility will be established over an area of less than 20ha on a site located approximately 26km north of Noupoort, in the Northern Cape, on portion 3 of Farm Rietfontein 140. The facility will have a maximum generating capacity of up to 20 MW. The
Establishment of the Inkululeko Solar Energy Facility, a photovoltaic (PV) solar energy facility, which will be located on portion 2 of Farm 167 Carolus Poort, approximately 3km north of Noupoort, in the Northern Cape. The facility will include arrays of photovoltaic panels, cabling between the project
Construction of the 240MW Mooi Plaats Solar PV Plant, and 132kV overhead power lines with associated grid connection, in the Umsobomvu Local Municipality, Pixley ka Seme District Municipality, Northern Cape. The generation capacity of the solar PV facility and the layout of the PV arrays will be dependent
Construction of the proposed Phezukomoya 315MW wind energy facility and the associated infrastructure which will be located approximately eight kilometres south east of the town of Noupoort in the Northern Cape Province. Reippp 5. The exact co-ordinates are currently not available however the possible