Construction of the Emkhiweni substation and the Arnot and Kendal remote ends near Middelburg in Mpumalanga. CIDB 9CE. This project entails the construction of a new substation comprising a 400kV and 132kV yard at a site in the Middelburg area. The project is part of a scheme that was initiated to strengthen
Completion of works for Driekoppies water treatment works phase 1A, construction of phase 4, elevated steel tank, pump station and pipelines phase 2D in Driekoppies, Mpumalanga. CIDB 9CE. Scope of works: Completion of works for phase 1A. New construction at WTW for phase 4. Construction of the Schulzendal
Construction works for the rehabilitation and upgrade of MDC Section 4D and 4E from Woestalleen interchange to Wonderfontein Near Middelburg, Mpumalanga. CIDB 9CE MDC 4D from km 34 to km 47.53 on N4-4 and MDC 4 E from km 0.00 to km 10.6 on N4-5X which is approximately 24.13km. CIDB 9CE. The GPS coordinates
South 32 (previouslly BHP Billiton) intends to expand its coal mine operations in the Ogies area in the Mpumalanga Province. It is contractually bound to provide the adjacent Kendal Power Station (Eskom) with 13.3MT of coal per annum until 2033. Khutala Resource Optimisation Project. GPS coordinates
Construction works for the rehabilitation and upgrade of MDC section 4B and 4C from Van Dijks Drift interchange to Woestalleen interchange for a distance of approximately 24.4km, Mpumalanga CIDB 9CE. The GPS coordinates have been placed on the Woestalleen IC 25°49'45.5"S 29°40'09.1"E
Reconstruction of road D481 between Mooiplaas and Ekulindeni for a distance of 7.2km in Gert Sibande Region of Mpumalanga. The project value is R 110 339 061,03. The exact co-ordinates are currently not available however the marker has been placed in Ekulindeni 26°00'09.2"S 31°04'10.9"E.
Rehabilitation including selective treatment of road P8/1 between Mashishing and Bambi for a distance of 11km in the Bohlabela District of Mpumalanga. Value R 171 458 454.21 Scope of works indicates this is Part A. The GPS co-ordinated have been placed at Road D2258 to Bosoord off the P8/1 (R36) intersection
Upgrading of the Verena water infrastructure in Ward 08 in the Thembisile Hani Local Municipality, Mpumalanga. Estimated value of R38 855 536.01. The exact GPS coordinates are not known and the marker has been placed at Kwaggafontein C as per the site inspection 25°18'41.4"S 28°57'02.2"E
Upgrading of road D4407 between Hluvukani and Timbavati for 7.82km, road D4409 at Welverdiend for 6.88km and road D4416/2 between Welverdiend and road P194/1 for 1.19km in the Bohlabela region of the Mpumalanga Province. Estimated value R129 726 892,23 GPS co-ordinates: 24°34'52.03"S 31°19'37.88"E (Intersection
Upgrading of the Thembalethu water infrastructure in Ward 05 in the Thembisile Hani Local Municipality, Mpumalanga. The project value is R 26 821 154,34. The exact GPS co-ordinates are not known and the marker has been placed at Kwaggafontein C as per the site inspection 25°18'41.4"S 28°57'02.2"E