Construction of the FE Kudu Wind Energy Facility and associated infrastructure, on Portion 2 of Farm Oorlogspoort 85, approximately 40km west of Aberdeen in the Sarah Baartman District Municipality, Eastern Cape. The development will include up to 80 wind turbines, with a capacity of up to 150 MW, a
The Xolobeni project is regarded as one of the largest undeveloped mineral sands resources in the world, containing more than nine-million tons of ilmenite. The proposed Xolobeni mineral sands project will be a dry-mining operation as the area being mined is relatively small. Between 13 million tons
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
The Umoyilanga project will operate as a virtual power plant, combining generation from two sites which are 900 km apart, namely Avondale in the Northern Cape, with 115 MW of solar PV and 30 MW of battery storage, and Dassiesridge in the Eastern Cape, with 63 MW of wind and 45 MW of battery storage.
Construction of the Dassiesridge Wind Energy Facility. The wind farm will host approximately 60 turbines, with a potential power output of 180MW. Turbines will have a hub height of between 80 and 140 meters, with blades of 60 meter length. The wind farm is proposed to cover 7 300 ha and is located between
Establishment of the Avondale Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the Aberdeen Wind Facility in the Beaufort West area in the Eastern Cape Province. The proposal is for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m.
Construction of the Aberdeen Wind Facility - 1 within Beaufort West in the Eastern Cape Province. Proposed for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. Located approximately 20km west of Aberdeen, 32°29'48.1"S 23°58'39.4"E
Construction of the Aberdeen Wind Facility 3 in the Beaufort West area in the Eastern Cape Province. The proposal is for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. The site is located approximately 20km west of Aberdeen 32°30'01.5"S 23°58'00.3"E
Construction of the Aberdeen Wind Facility 2 in the Beaufort West area in the Eastern Cape Province. Scope of works is proposed as a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. The site is located approximately 20km west of Aberdeen, 32°30'37.4"S 23°59'49.0"