Construction works for the Edgars Sandton City reconfiguration project, Shop P11, Sandton City Shopping Centre, 83 Rivonia Road, Sandhurst, Sandton, Gauteng. Edgars are vacating the balance of their trading area occupied on Level 4, and a portion of their storage space on Level 2. Existing tenants within
Construction of the 22ML Woodmead reservoir situated off Woodmead Drive, Woodmead, Sandton, Gauteng. CIDB 8CE. The GPS Co-Ordinates are Lat -26.0553657, Long 28.0897266
Construction of the Burger King at Dainfern Square on the corner of William Nicol Drive & Broadacres Drive, Fourways, Sandton, Gauteng. The new restaurant is a free standing single storey building that will measure ± 325-m² GLA with a Drive-Thru. The GPS coordinates are -25.9938814, 28.0122085
Construction of the Olympus Sandton located at the corner of Empire Place and Rivonia Road, Sandton, Gauteng. The development will comprise of two, 12-storey buildings called the Athena and Apollo. The GPS coordinates are -26.1136204, 28.0524812
Construction of 38 privately walled full title cluster homes inside a security estate situated at 14 Duff Road, Craigavon, Sandton, Gauteng. Features include a park area within the complex, electric fencing and 24 hour security. GPS Co-ordinates Lat -26.0146262, Long 27.985496099999978
Construction of services and infrastructure for the Ennerdale South, Phase 2, located between Orange Farm and Lenasia South in Gauteng. CIDB 8 R40 to R130 million
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Construction of the Sandton Platinum Residences, (previously called Starwedge Apartments) located on 114 Rivonia Road, Sandown, Sandton, Gauteng. Residential Block A known as the Wedgewood is 44 871m² and consists of 40 levels. The second block, Residential Block B, known as Starleith is 40 772m² and
Construction of a pedestrian link bridge over Sandton Drive in Johannesburg, Gauteng. The scope of works comprises the construction of a bridge link over Sandton Drive, comprising a northern and southern bridge, a central pavilion walkway, light towers and a northern and southern ramp. The bridge is
Construction of three spec warehouses for the Bankenveld District City located on Erf 22, Bankenveld District City, Linbro Park, Sandton, Gauteng. The scope of works involve the development of the three warehouses each measuring the following: 7695m² warehouse, 770m² offices (each totalling 8465m²).