Construction of the bulk potable water distribution infrastructure and its associated appurtenant works from Splitskop to Mototolo, under Lebalelo Water User Association, Limpopo. CIDB 7CE. The scope of works includes the design and construction of the bulk potable water distribution infrastructure
Construction of road from Mokwete to Molepane Phase 2, Jane Furse, Limpopo. CIDB 7CE. The exact GPS location is not known and the Marker has been placed on route 24°48'02.8"S 29°52'57.9"E.
The demolition, refurbishment and construction at Kopanong Primary School In Riverside Village, Gamaleetse, Jane Furse Sekhukhune District, Limpopo. The project value is R63 984 925.00. The scope of works could include the demolition of 15 classrooms, 4 pit latrine seats, refurbishment of 8 classrooms
Development and construction of a 35 MW solar plant at or adjacent to the mine that will power Sedibelo's mining operations in the North West province. The GPS coordinates have been placed at the Pilanesberg Platinum Mine, lat: -25.1058397; long: 26.988417
Construction of The Oaks Shopping Centre located on portion 11 of the Farm “The Oaks” No. 198-KT, Diphuti Village, corner of Morupu Mmola Road and R36, Maruleng, Limpopo. The development cost is estimated at a value of R200 million. The construction area is approximately 10 890m² and the scope of work
Construction, infrastructure maintenance, repairs of buildings, civil, mechanical, electrical and installations at Pontdrift, Platjan and Zanzibar Land Port of entry in Limpopo. CIDB 7CE/GB. The GPS marker has been placed at Zanzibar Land Port of entry 22°34'29.7"S 28°28'06.1"E
The Zebediela project is a large disseminated sulphide resource with mining engineering aspects similar to porphyry copper deposits in terms of size and grade. The proposed mining rate is 20 million tonnes a year using a contractor mining fleet. The Zebediela Nickel Project is located in the Limpopo
The proposed project will involve opencast and underground mining operations to take place on Portion 1 of the farm Zoedveld 294 KR and portions 4,5 and 18 of the farm Grasvally 293 KR. Reclamation of the existing residue deposits and waste rock dumps will also take place where feasible on site. The
Construction of Mampuru bulk water scheme, Phase 1B which relates to the pump station, Sekhukhune District Municipality, Groblersdal, Limpopo. CIDB 7CE. Pumpstation Implementation entails the construction of the following elements: Site clearance and excavation, pumpstation building, gravel access road,
Upgrading of the Maepa access road, Ga-Maepa, under the Greater Tubatse Local Municipality, Limpopo. Project value of R39 741 790.07. The approximate GPS location has been placed along the proposed route of construction 24°51'51.5"S 29°55'08.8"E.