Construction of the completion works for the Tshwane University of Technology specialised lecture theatres at the Ga-Rankuwa Unit 2, Ga-Rankuwa, Pretoria, Gauteng. CIDB 8GB. The GPS coordinates are -25.618180499158733, 28.002361944178915
Construction of a new 800-bed student accommodation located at Sefako Makgatho Health Sciences University (SMU) in Garankuwa, Tshwane, Gauteng. CIDB 9GB. The exact GPS has been placed at the university, 25°36'46.6"S 28°01'06.8"E.
Construction works for the completion of the infrastructure works at Ga-Rankuwa Ext 10, Pretoria, Gauteng. CIDB 7CE. The scope of works entails the following: water reticulation, construction of new 1140m long 110mm Ø uPVC pipe in Phase 5, supply and installation of 67 isolation valves, supply and installation
Upgrading of roads and stormwater systems in Ga-Rankuwa Zone 4, Phase 2, Pretoria, Gauteng. CIDB 7CE The project involves the upgrading of residential streets in Garankuwa Zone 4. Extent of the works are as follows: grubbing, mass earthworks for the roads, excavation (soft, intermediate and hard rock)
Construction works to complete the outstanding works for the Radiation Oncology Outpatient Facility at Dr. George Mukhari Academic Hospital located on Setlogelo Drive, Ga-Rankuwa Unit 2, Ga-Rankuwa, Gauteng. The newly appointed contractor is expected to complete the works of the +-1865m² Oncology centre
Upgrading of roads and stormwater systems in Ga-Rankuwa Zone 5, Phase 1, Ga-Rankuwa, Pretoria, Gauteng. CIDB 7CE. The proposed length of the streets to be upgraded is roughly 2252m. Stormwater runoff will be managed using a combination of trapezoidal concrete channels, edge beams, and existing kerb inlets
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Completion of Babelegi 15ML reservoir, water tower, pump station and bulk pipeline in Ramotse, Gauteng. R36 770 208,70 (Incl VAT). The exact GPS Coordinates are 25°22'47.0"S 28°17'53.1"E
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue