Upgrade of Phase 1 of the internal water reticulation network in Chris Hani, Richblock and Las Vegas located within the Magareng Local Municipality, Northern Cape. CIDB 7CE. The exact GPS co-ordinates are not known so the marker has been placed at the Magareng Local Municipality Offices, Magrieta Prinsloo
Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Construction of the Engineering Operations Centre (EOC) for the South African Radio Astronomy Observatory (SARAO) at Klerefontein, Northern Cape. The project value is R 302 635 800,36. The scope of works will include: SARAO will require the services of various specialists (Architectural including Structural)
Construction of the 140MW Platberg Wind Energy Facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25 km south from Victoria West, 40 km north from Murraysburg and 40 km west from Richmond in the Northern Cape. The GPS co-ordinates are 31°36'38.9"S 23°23'22.3"E.
Construction of the 140MW Teekloof wind energy facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25km south from Victoria West, 40km north from Murraysburg and 40km west from Richmond in the Northern Cape. The exact co-ordinates are currently not available however
Upgrade of internal water reticulation network for Phase 2 in Chris Hani, Richblock and Las Vegas located within the Magareng Local Municipality, Northern Cape. The project value is R 24 449 047,15. The exact GPS co-ordinates are not known so the marker has been placed at the Magareng Local Municipality