Construction of the Solaire Direct Graspan Photovoltaic (PV) Power Facility on Farm Graspan no. 172, situated in the Siyancuma Local Municipality in the Northern Cape. This project has been selected as a Preferred Bidder project under Round 5 of the Renewable Energy Independent Power Producers Procurement
Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Periodic maintenance and resurfacing of National Route 12 on Section 9 from Hope Town at km 0.00 to Kimberley at km 117.50 in the Sol Plaatjie Local Municipality, Northern Cape. The exact GPS location is not known and the Marker has been placed on the National Route 12 just outside of Hope Town, 29°36'19.4"S
Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Refurbishment of waste water treatment works, Phase 2 in Hopetown, Northern Cape. Completion Contract CIDB 7CE. The GPS marker has been placed at the Hopetown wastewater treatment works 29°36'27.0"S 24°05'20.8"E
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Construction of the Engineering Operations Centre (EOC) for the South African Radio Astronomy Observatory (SARAO) at Klerefontein, Northern Cape. The project value is R 302 635 800,36. The scope of works will include: SARAO will require the services of various specialists (Architectural including Structural)
Construction of the 140MW Platberg Wind Energy Facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25 km south from Victoria West, 40 km north from Murraysburg and 40 km west from Richmond in the Northern Cape. The GPS co-ordinates are 31°36'38.9"S 23°23'22.3"E.