The Umoyilanga project will operate as a virtual power plant, combining generation from two sites which are 900 km apart, namely Avondale in the Northern Cape, with 115 MW of solar PV and 30 MW of battery storage, and Dassiesridge in the Eastern Cape, with 63 MW of wind and 45 MW of battery storage.
Construction of the Dassiesridge Wind Energy Facility. The wind farm will host approximately 60 turbines, with a potential power output of 180MW. Turbines will have a hub height of between 80 and 140 meters, with blades of 60 meter length. The wind farm is proposed to cover 7 300 ha and is located between
Establishment of the Avondale Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion
Construction of the Bhisho High Court additional accommodation on erf 4788 in Parliament Hill in Bhisho, Eastern Cape. Scope of works could include: Public entrance foyer, staff entrance foyer, cash hall, civil courts, criminal courts, children’s court, prison cells, offices, administration area, CCTV
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the Aberdeen Wind Facility in the Beaufort West area in the Eastern Cape Province. The proposal is for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m.
Construction of the Aberdeen Wind Facility - 1 within Beaufort West in the Eastern Cape Province. Proposed for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. Located approximately 20km west of Aberdeen, 32°29'48.1"S 23°58'39.4"E
Construction of the Aberdeen Wind Facility 3 in the Beaufort West area in the Eastern Cape Province. The proposal is for a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. The site is located approximately 20km west of Aberdeen 32°30'01.5"S 23°58'00.3"E
Construction of the Aberdeen Wind Facility 2 in the Beaufort West area in the Eastern Cape Province. Scope of works is proposed as a cluster of 41 wind turbines with a hub height of up to 200m and the rotor height up to 300m. The site is located approximately 20km west of Aberdeen, 32°30'37.4"S 23°59'49.0"
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of the Teraco Facilities in Isando and Bredell, Kempton Park, Gauteng. The development includes building the Isando Campus JB1/JB3/JB5 (70MW), Bredell Campus JB2/JB4 (64MW), Cape Town Campus CT1/CT2 (50MW), and Durban (1MW).
Construction of the new Vantage Data Centre 3, in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities.
Construction of the proposed new JB3 addition to the Teraco Isando Data Centre Campus situated in Kiln Street, Erf 302 - Erf 305, Isando, Extension 1, Kempton Park, Gauteng. This hyper scale data centre will stand as the largest entity of its kind in Africa at 60 MVA capacity.
The first of two
Construction of the 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. It will comprise 60 000m² of building structure serviced by 80MW of utility power supply servicing 50MW of critical power load. The GPS is : 26°01'29.5"S 28°16'01.8"E.
Construction of the Vantage Data Centre 2 in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities. The
Construction of a new hyperscale Teraco Data Centre, that will be known as JB5, situated at Isando, Kempton Park, Johannesburg, Gauteng. Key Facts, JB5 comprises 55 000 sqm of building structure serviced by 120MVA of utility power supply. JB5 will be build in a single phase and includes 12 1000sqm halls.
Construction of a new 30MW data centre facility in Cape Town, Western Cape. The CT2 comprises 25,000 square meters of building structure, 8,000sqm of data hall space, and 18 megawatts of critical power load.. GPS coordinates lat: -33.9015065; long: 18.6791515.
Construction of the proposed new 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. Phase one of the JB4 data centre is scheduled to be completed in the first quarter of 2022. The JB4 data centre will comprise a 50 000m² of building structure serviced by 80MW of utility power supply,
Construction of Teraco CT2 Data Centre Phase 2 on Rubicon Boulevard, Brackenfell South in Cape Town, Western Cape. The GPS location is 33°54'21.2"S 18°40'49.3"E
Upgrade to the Amatola Sun Hotel formerly known as the Crown Jewel in Bhisho, Eastern Cape. The value: R3 Billion. The exact co-ordinates are currently not available however the approximate area of construction is Bhisho, 32°51'00.4"S 27°26'25.2"E
Improvements of National Route R63 sections 15 and 16 from Bhisho at km 5.8 to the N6 Bridge Intersection at km 1.0, Eastern Cape. The project value is R 1 347 079 099,00. Scope of works: Upgrading of the existing two-lane single carriageway to a dual carriageway from km 5.9 to km 9.6 (approximately
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.