Periodic maintenance on National Route 2 Section 9 between the Stormsriver Village I/S at km 22.5 and Witelsbos at km 37.0 in the Local Municipality of Kou-Kamma within the Sarah Baartman District Municipality, Eastern Cape. CIDB 8CE. The exact GPS location is not known and the marker has been placed
Construction of a 13 turbine wind farm with a maximum generation capacity of 30.6MW with reinforced concrete foundation, gravel access road and fencing located on the Broadlands farm near Humansdorp in the Kouga Local Municipality of the Cacadu District Municipality, Eastern Cape. The exact co-ordinates
The Xolobeni project is regarded as one of the largest undeveloped mineral sands resources in the world, containing more than nine-million tons of ilmenite. The proposed Xolobeni mineral sands project will be a dry-mining operation as the area being mined is relatively small. Between 13 million tons
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Maintenance of the N2 Section 9 between Bloukrans River at km 0.0 and Storms River Village I/S at km 22.5 in the Kou-Kamma Local Municipality, Sarah Baartman District Municipality, Eastern Cape. Project value: R93 027 325.13. The exact GPS location is not known and the Marker has been placed near the
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
The Umoyilanga project will operate as a virtual power plant, combining generation from two sites which are 900 km apart, namely Avondale in the Northern Cape, with 115 MW of solar PV and 30 MW of battery storage, and Dassiesridge in the Eastern Cape, with 63 MW of wind and 45 MW of battery storage.
Construction of the Dassiesridge Wind Energy Facility. The wind farm will host approximately 60 turbines, with a potential power output of 180MW. Turbines will have a hub height of between 80 and 140 meters, with blades of 60 meter length. The wind farm is proposed to cover 7 300 ha and is located between
Establishment of the Avondale Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion