Construction of the 360MW Sonvley wind energy facility, on Portion 4 of the Farm Kap Vley 315; Portions 2, 3 and 4 of the Farm Zonnekwa 328 and Portion 1 of the Farm Zonnekwa 326, situated approximately 25km south east of Kleinsee, Northern Cape. The scope of works includes but is not limited to: Up
Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Construction of a 300MW Kleinzee wind energy facility and the associated infrastructure in the Northern Cape. The facility is proposed to accommodate up to 200 appropriately spaced turbines over an extent of of approximately 8 682 hectares. The exact co-ordinates are currently not available however marker
Infrastructure maintenance and repairs of building, civil, mechanical & electrical installation for the Nakop, Gemsbok, Rietfontein and Tweerivieren Land Port of Entry in the Northern Cape. CIDB 8CE/GB. The GPS coordinates for Nakop border post is 28°05'46.3"S 20°00'00.0"E
Establishment of the Project Blue Solar Energy Facility, a photovoltaic (PV) solar facility, at a site north of the town of Kleinsee within the Nama Khoi Local Municipality, in the Northern Cape, and within a De Beers mining area. This is to be phase 4 of the proposed Project Blue Renewable Energy Facility.
Construction of a major dam on the Lower Orange River in the Northern Cape. The site is approximately 6km upstream of the Noordoewer and Vioolsdrift border post. The exact co-ordinates are currently not available however the marker has been placed near the Vioolsdrift border post 28°46'16.2"S 17°37'27.1"
Construction of a wind energy facility and associated infrastructure, Kokerboom 1 wind farm in the Northern Cape. Kokerboom 1 wind farm is located on farm portions Leeuwberg Rivier (RE/1163) and Kleine Rooiberg (RE/227) approximately 50km North of Loeriesfontein, 85km West of Brandvlei and 160km southeast
Construction of a 300 MW wind energy facility and associated electrical infrastructure on the remainder (RE) Kommagas Farm 200 Portion 5, RE Kap Vley Farm 315, portion 1 of Kap Vley Farm 315, portion 2 of Kap Vley Farm 315, portion 3 of Kap Vley Farm 315, portion 3 of Platvley Farm 314, RE Kourootjie
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light