Special maintenance of Koppies to Sasolburg Road, P30/1 for a total of 61km in the Free State. Project value: R211 920 419.47. The approximate GPS location has been placed along the proposed area of construction -27,1129525, 27.7212712.
Construction of the N8 Corridor Rail Link, which will run from Kimberley in the Northern Cape, to Maseru in Lesotho. The rail link runs across the entire Free State province. The exact co-ordinates are currently not available however the approximate area of location is lat: -29.297646130032195, long:
Construction of a 120MW utility-scale solar photovoltaic project located in the Free State. The project will be owned by Teraco and is expected to be operational in 2026. Estimated cost: R2 billion. The GPS coordinates are unknown at this stage, and the marker has been placed at the Juwi offices -30.818951506324833,
Upgrading of the KwaKwatsi township secondary bulk water pipelines in Koppies, Free State. CIDB grading: 7CE or higher. Estimated GPS coordinates lat: -27.2278474; long: 27.5936059.
Construction of the Heuningspruit 50MW photovoltaic solar facility with battery storage and supporting infrastructures, near Koppies, within Ngwathe Local Municipality, in the Free State. The proposed PV site is located on farm Voorspoed 1508 and Verdun No 1511. GPS Coordinates 27°26'56.08"S 27°24'53.54"E
Construction of a new carriageway including new bridges and rehabilitation of the existing carriageway between the Wilge Toll Plaza and the Vaal River of the N3 Toll Road: N3-9 km 74,5 to km 77,2 and N3 - 10 km 0,0 to km 1,0 Highway Section 8B within the Free State and Mpumalanga Provinces. The majority
Construction of water networks at Grassland 4 for 2 500 households located in the Free State. CIDB 8CE. The exact co-ordinates are currently not available however the approximate area of location is lat: -29.1656155; long: 26.304279.
The project involves the optimal extraction of the orebody within the lower mine area of the Moab Khotsong, beneath the farm Zaaiplaats in the Free State. The project will extend the mine's life to 2035 and entails the deepening of the mine from 101 level to 105 level. The most important of these blocks
Taung Gold (Free State) Pty Ltd (Taung) is proposing to revive the historical Jeanette Gold Mine. The proposed project is located approximately 20km northwest of Welkom in the Free State Province, The majority of the target ore resource lies between the R30 provincial road in the north and the R34 provincial
Construction of the Teraco Facilities in Isando and Bredell, Kempton Park, Gauteng. The development includes building the Isando Campus JB1/JB3/JB5 (70MW), Bredell Campus JB2/JB4 (64MW), Cape Town Campus CT1/CT2 (50MW), and Durban (1MW).
Construction of the new Vantage Data Centre 3, in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities.
Construction of the proposed new JB3 addition to the Teraco Isando Data Centre Campus situated in Kiln Street, Erf 302 - Erf 305, Isando, Extension 1, Kempton Park, Gauteng. This hyper scale data centre will stand as the largest entity of its kind in Africa at 60 MVA capacity.
The first of two
Construction of the 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. It will comprise 60 000m² of building structure serviced by 80MW of utility power supply servicing 50MW of critical power load. The GPS is : 26°01'29.5"S 28°16'01.8"E.
Construction of the Vantage Data Centre 2 in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities. The
Construction of a new hyperscale Teraco Data Centre, that will be known as JB5, situated at Isando, Kempton Park, Johannesburg, Gauteng. Key Facts, JB5 comprises 55 000 sqm of building structure serviced by 120MVA of utility power supply. JB5 will be build in a single phase and includes 12 1000sqm halls.
Construction of a new 30MW data centre facility in Cape Town, Western Cape. The CT2 comprises 25,000 square meters of building structure, 8,000sqm of data hall space, and 18 megawatts of critical power load.. GPS coordinates lat: -33.9015065; long: 18.6791515.
Construction of the proposed new 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. Phase one of the JB4 data centre is scheduled to be completed in the first quarter of 2022. The JB4 data centre will comprise a 50 000m² of building structure serviced by 80MW of utility power supply,
Construction of Teraco CT2 Data Centre Phase 2 on Rubicon Boulevard, Brackenfell South in Cape Town, Western Cape. The GPS location is 33°54'21.2"S 18°40'49.3"E