Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Upgrading of the Dontsa Water Supply Scheme, situated in the Amathole District Municipality, Eastern Cape. CIDB 7CE. The scope of works includes the upgrading of a pump station, construction of a rising main and reinforced concrete reservoirs. The exact GPS co-ordinates are not known so the marker has
Conversion of the old tennis court site into a new shopping complex in Keiskammahoek, Eastern Cape. GPS co-ordinates are being sourced. The exact co-ordinates are currently not available however the approximate area of location is 32°41'05.5"S 27°07'56.5"E.
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Construction of the new Huku Police Station on Portion 7 of the farm Mndileni No. 88 SG, in the Eastern Cape. The project value is approximately R 90 000 000,00. The exact co-ordinates are currently not available however the approximate area of location is Mandileni. 30°43'49.7"S 28°50'26.7"E.