Eastern Plats is planning to develop an openpit mine at the facility, which is located on the eastern limb of the Bushveld Complex in Limpopo. To be known as the Mareesburg Project. The proposed development at the Mareesburg open-pit mine would increase the company's annual production to about 325,000oz
Construction of the bulk potable water distribution infrastructure and its associated appurtenant works from Splitskop to Mototolo, under Lebalelo Water User Association, Limpopo. CIDB 7CE. The scope of works includes the design and construction of the bulk potable water distribution infrastructure
Construction of Motantanyane and Ledwaba water supply Phase 1, contract E in Motantanyane and Ledwaba, Limpopo. Value of the project: R50 202 606,00. Scope of works includes: Construction 5Ml concrete reservoir with 2 inlets (with 2 bulk water meters), 400mm diameter and 450mm diameter and the discharge,
Construction of the earthworks at the Bokoni Platinum Mines in Polokwane, Limpopo. Scope of works could include: stormwater drainage and buried services (potable water, sewer and electrical sleeves), upgrade existing roads and construction of concrete lined stormwater drains. GPS coordinates 24°17'20.6"S
Development and construction of a 35 MW solar plant at or adjacent to the mine that will power Sedibelo's mining operations in the North West province. The GPS coordinates have been placed at the Pilanesberg Platinum Mine, lat: -25.1058397; long: 26.988417
Construction of The Oaks Shopping Centre located on portion 11 of the Farm “The Oaks” No. 198-KT, Diphuti Village, corner of Morupu Mmola Road and R36, Maruleng, Limpopo. The development cost is estimated at a value of R200 million. The construction area is approximately 10 890m² and the scope of work
Expansion of the existing concentrator plant at the Bokoni Platinum Mines in Polokwane, Limpopo. Scope of works could include: security access control terrace, new magazine building terrace, new community centre terrace, new contractors laydown terrace, stormwater drainage and buried services as well
Construction of the Motantanyane water supply Phase 1: Contract B, Motantanyane, Limpopo. The project value is R56 746 250,00. The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station, Lebowakgomo Zone F (next to Complex) 24°18’29.31”S 29°29’14.19 “E.
Construction, infrastructure maintenance, repairs of buildings, civil, mechanical, electrical and installations at Pontdrift, Platjan and Zanzibar Land Port of entry in Limpopo. CIDB 7CE/GB. The GPS marker has been placed at Zanzibar Land Port of entry 22°34'29.7"S 28°28'06.1"E
Improvement on National Road R578 Section 1 from Nwamatatani from km 56.0 to R81 at km 90.7 in Limpopo province, in the Greater Giyani local municipality. The exact co-ordinates are currently not available however the approximate area of location is 23°20'12.1"S 30°39'54.3"E