Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Completion of Babelegi 15ML reservoir, water tower, pump station and bulk pipeline in Ramotse, Gauteng. R36 770 208,70 (Incl VAT). The exact GPS Coordinates are 25°22'47.0"S 28°17'53.1"E
Construction of the Isondo Precious Metals Facility, on Portion 282 of the Farm Witkoppie No. 64 – IR, OR Tambo SEZ (Gauteng Industrial Development Zone), Bonaero Park, Kempton Park, Gauteng. The Facility will manufacture Platinum Group Metal (PGM) based Membrane electrode assemblies (MEA) and catalysts
Construction of the 2 000 bed student accommodation building for the Sefako Makgatho Health Sciences University situated along Molotlegi Street, Ga-Rankuwa Zone 1, Ga-Rankuwa, Gauteng. Value of the project is estimated at R550 million. The approximate GPS location has been placed along the proposed area
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction of a high-speed rail line connecting Johannesburg and the ports of Durban, with a total length of about 570 kilometers within South Africa. The exact GPS co-ordinates are not yet known however the GPS marker has been placed at the Gauteng Province, Lat -26.2707593, Long 28.1122679
Construction of the Teraco Facilities in Isando and Bredell, Kempton Park, Gauteng. The development includes building the Isando Campus JB1/JB3/JB5 (70MW), Bredell Campus JB2/JB4 (64MW), Cape Town Campus CT1/CT2 (50MW), and Durban (1MW).
Construction of the new Vantage Data Centre 3, in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities.
Construction of the proposed new JB3 addition to the Teraco Isando Data Centre Campus situated in Kiln Street, Erf 302 - Erf 305, Isando, Extension 1, Kempton Park, Gauteng. This hyper scale data centre will stand as the largest entity of its kind in Africa at 60 MVA capacity.
The first of two
Construction of the 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. It will comprise 60 000m² of building structure serviced by 80MW of utility power supply servicing 50MW of critical power load. The GPS is : 26°01'29.5"S 28°16'01.8"E.
Construction of the Vantage Data Centre 2 in Isando, Kempton Park, Gauteng. The new data centre is located 2km from the Teraco site in Isando and it will feature dedicated offices, general work spaces, break areas, conference rooms, meeting spaces and secure storage areas amongst other amenities. The
Construction of a new hyperscale Teraco Data Centre, that will be known as JB5, situated at Isando, Kempton Park, Johannesburg, Gauteng. Key Facts, JB5 comprises 55 000 sqm of building structure serviced by 120MVA of utility power supply. JB5 will be build in a single phase and includes 12 1000sqm halls.
Construction of a new 30MW data centre facility in Cape Town, Western Cape. The CT2 comprises 25,000 square meters of building structure, 8,000sqm of data hall space, and 18 megawatts of critical power load.. GPS coordinates lat: -33.9015065; long: 18.6791515.
Construction of the proposed new 2 level Teraco Data Centre situated in Bredell, Kempton Park, Gauteng. Phase one of the JB4 data centre is scheduled to be completed in the first quarter of 2022. The JB4 data centre will comprise a 50 000m² of building structure serviced by 80MW of utility power supply,
Construction of Teraco CT2 Data Centre Phase 2 on Rubicon Boulevard, Brackenfell South in Cape Town, Western Cape. The GPS location is 33°54'21.2"S 18°40'49.3"E