You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 1027 items with Total of 1045 results

Advertising



Projects

Balfour Clinic, Eastern Cape
156
  • 28649
Construction of the Balfour Clinic located on Erf 833 Balfour, Eastern Cape. The contact value is R52 059 255.81. The exact GPS location is not known and the Marker has been placed at old Balfour Clinic 32°32'43.3"S 26°40'57.9"E .


Projects

Zalu Dam
358
  • 16237
Construction of the Zalu Dam on Xura River near Lusikisiki, in the Eastern Cape Province.


Projects

Xolobeni Mineral Sands Project
583
  • 940
The Xolobeni project is regarded as one of the largest undeveloped mineral sands resources in the world, containing more than nine-million tons of ilmenite. The proposed Xolobeni mineral sands project will be a dry-mining operation as the area being mined is relatively small. Between 13 million tons


Projects

R72 Section 4 and MR501 Intersection, Kidds Beach
99
  • 28848
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.


Projects

Moyeni Police Station
743
  • 10741
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.


Projects

Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56
248
  • 10504
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes


Projects

Wilo Comprehensive Senior Secondary School
498
  • 17951
Construction of the Wilo Comprehensive Senior Secondary School, Eastern Cape. Estimated Value R 65 922 974,03. The exact co-ordinates are currently not available however the approximate area of location is 31°52'56.6"S 28°57'57.5"E .


Projects

Ntamonde Police Station
371
  • 13946
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E


Primary

The Umoyilanga project will operate as a virtual power plant, combining generation from two sites which are 900 km apart, namely Avondale in the Northern Cape, with 115 MW of solar PV and 30 MW of battery storage, and Dassiesridge in the Eastern Cape, with 63 MW of wind and 45 MW of battery storage.

Projects

Dassiesridge Wind Energy Facility
0
  • 13610
Construction of the Dassiesridge Wind Energy Facility. The wind farm will host approximately 60 turbines, with a potential power output of 180MW. Turbines will have a hub height of between 80 and 140 meters, with blades of 60 meter length. The wind farm is proposed to cover 7 300 ha and is located between

Projects

Avondale Solar Park
0
  • 13056
Establishment of the Avondale Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion


Projects

Motherwell Wind Energy Facility - Phase 2
228
  • 18930
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution

Advertising

Send me a Sample Based on these search results