Ledwaba, Mmakotse & Motantanyane WS, Phase 1 Contract D
137
  • 33606
Construction of Ledwaba, Mmakotse and Motantanyane villages water supply Phase 1, Contract D in Limpopo. Contract value R46 223 960.00 The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station 24°18’29.31”S 29°29’14.19 “E.


Projects

Van Wyksrust SPS Upgrades
133
  • 35120
Upgrades and renovations to the Van Wyksrust sewer pump station, Contract 1 at the Olifantsvlei waste water treatment works located along Cavendish Street, in Soweto, Gauteng. CIDB 8CE. The work largely involves repairing and replacing of existing infrastructure and equipment which are either damaged,


Projects

Stocks RWS, Phase 1, Contract C
134
  • 33627
Construction of Contract C for Phase 1 of the Stocks Regional Water Supply project in Limpopo. Value of contract R54 525 868,00. The project is located about 60km north east of Polokwane town and situated at Ledwaba (Mmakotse Extension), Mmakotse, Motantanyane and Hwereleng villages within the jurisdiction


Projects

Kagisano Molopo BWSS, Contract A
160
  • 30770
Construction of Kagisano Molopo bulk water supply scheme in Tlapeng Village for Cluster 2, Contract A in Mafikeng, North West. CIDB 8CE. The GPS location has been placed at a general location of Tlapeng until exact GPS coordinates have been sourced -26.8371424, 23.9300764


Projects

Carolina WWTW WP2
141
  • 32648
Upgrading of the water treatment works work package 2 in Carolina, Chief Albert Luthuli Municipality, Mpumalanga. Estimated value of R90 079 110,38. The exact GPS coordinates are not known and the marker has been placed at the Carolina fire station 26°04'26.2"S 30°06'37.3"E


Projects

Rising Main to Kwanojoli Reservoir
126
  • 36324
Upgrading of the rising main to KwaNojoli reservoir in Somerset East, Blue Crane Route Local Municipality, Eastern Cape. CIDB 7CE. The GPS coordinates have been placed at the reservoir 32°44'14.0"S 25°35'33.0"E


Projects

Williston WWTW
178
  • 34384
Upgrading of the existing Williston wastewater treatment works, located in Williston, Northern Cape. Value of R34 888 750.60. The existing wastewater treatment works capacity to be upgraded to treat raw, pumped, sewage flows for the current estimated permanent and seasonal population fluctuations of


Projects

Netcare Sunninghill Hospital EWST
145
  • 35709
Construction of a new emergency water storage tank for Netcare Sunninghill located on Portions 388 & 487 of the Farm Rietfontein 2IR, Witkoppen Road and Nanyuki Road, Sunninghill, Sandton, Gauteng. The scope of work entails the following: Removal and reinstating of paving, excavations, installation of


Projects

Malamulele South Villages WSS, Phase 1
119
  • 36322
Construction of phase 1, pumping system for Jimmy Jones, Mphambo Extentions, Xigamani and Muswani Villages, Limpopo. CIDB 8CE. The detailed scope of work is as follows: Power supply to abstraction works, Power supply to new high lift pumpstation and small power and lighting installation. The following


Projects

Vondo WTW Upgrade
155
  • 31259
Upgrading of 450mm dia pump main from Vondo WTW to reservoirs R3A and R3B in the Vhembe District Municipalty, Limpopo. The project value is R84 437 296,08. The centre of the proposed site is located approximately 7,5km west of the main intersection in Sibasa in the Vhembe District of the Limpopo Province