Completion of Loskop Abstraction Works and Commissioning the Waterworks in Loskop, KwaZulu-Natal. CIDB: 7CE or higher. The works comprises the following: Civil Works: Completion of the reinforced concrete structural works for the Abstraction Pump Station Structural steel works for installation at the
Upgrading of the Nelsonskop sewage plant at Matimba Power Station, Lephalale, Limpopo. CIDB 7CE. The works is inclusive of all activities necessary for the provision of a fully functional sewage treatment plant that meets Eskom and Department of Water and Sanitation requirements. The Contractor designs,
Construction of Phase 5B, contract 1 of the Sidwadweni regional water supply scheme in O.R. Tambo District Municipality, Eastern Cape. Project Value: R288 760 392.02. The scope of work for Contract 1 entails the construction of the civil and structural elements of the abstraction works, 6 Mℓ/day water
Construction of a steel inlet main for phase 2 of the Hammarsdale High Level Reservoir going through Wards 04 & 103 in Hammarsdale, KwaZulu-Natal. CIDB 7CE. The scope of work could include the construction of approximately 2700m long, 500mm ᴓ steel inlet main. The 500mm Ø pipeline route starts at the
Construction of 70km of 1 200mm diameter steel pipeline from the Flag Boshielo dam to a terminal reservoir at Pruissen (near Mokopane) in Limpopo Province. CIDB 9CE. Along the route, three pump stations will be required: the first at the Flag Boshielo dam, the second in the vicinity of Immerpan (on the
Upgrading of the Ugie water treatment works, located on JK Bhokwe Street, Ugie, Eastern Cape. CIDB 7CE. The scope of works includes increasing the Ugie plant capacity from 3Ml/d to an estimated 7Ml/d. The approximate GPS co-ordinates are 31°11'17.0"S 28°15'00.0"E
Upgrade of phase 2 of the Bergville bulk water supply in Bergville, KwaZulu-Natal. Value of R33 455 334.72. The works consist of the following: approximately 4.1kms of bulk water rising mains and associated pipe line infrastructure. Civil and structural works for the new clear water pump station and
Construction of a 30ml reservoir and the completion of a bulk water feeder line, water reticulation and sewer reticulation in Booysens Extension 4, in Pretoria, Gauteng. CIDB 9CE. Estimated GPS coordinates 25°42'17.9"S 28°05'22.4"E
Completion works of the bulk water steel piping and water reticulation in Mamelodi Ext 11, Pretoria, Gauteng. R231 122 472.89. The works consists of an upgrade and relocation of the Mamelodi/Bronberg bulk water line which is currently in operation and is directly linked to the R5 and R6 reservoir zones
Construction of the Esiphambanweni Domestic Reticulation Network: Zone L1-A in Nongoma, KwaZulu-Natal. The scope of works consists of approximately 48km reticulation network with pipe diameters between 20mm (HDPE) to 355mm (oPVC) and yard taps, including air, scour and isolating valves, meter chambers,