You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 2452 items with Total of 2643 results

Advertising



Projects

HEWU RA60 RWSS: Poplar Grove
154
  • 34032
Construction of the HEWU RA60 Regional Water Supply Scheme: bulk water supply from Poplar Grove via Merino Walk to Endsome, Lukanji, Chris Hani District Municipality, Eastern Cape. Project Value: R124 656 311.24. The exact GPS location is not known and the Marker has been placed at Poplar Grove: 32°07'46.9"S


Projects

Refurbishment of Mdantsane Sewer Treatment Works
244
  • 18660
The refurbishment of Mdantsane Sewer Treatment Works situated in Mdantsane, East London, Eastern Cape. CIDB 8 CE. The exact GPS co-ordinates are 32°56'45.9"S 27°43'29.7"E.


Projects

Nsikazi North Water Reticulation Phase 3
181
  • 30578
Construction of the Nsikazi North Water Reticulation Phase 3 in Nyongane Township, Mpumalanga. Value of R33 188 682.59. The scope of works could include: general requirement and provision, contractor’s establishment on site and general obligations, housing, offices and laboratories for the engineer’s


Projects

Klarinet and Siyanqoba BWS
164
  • 25742
Construction of the Klarinet and Siyanqoba bulk water supply in Emalahleni Local Municipality, Mpumalanga. Exact value withheld. The overall scope of works entails the installation of 5.8km of bulk water pipes, sizes varying from 800mm to 1 200mm in diameter. The scope applicable for the contract will


Projects

Imvutshane Gauging Weir
122
  • 36269
Construction of the Imvutshane gauging weir at the Maphumulo water treatment plant, in Mapumulo, KwaZulu-Natal. CIDB 7CE. The GPS marker has been placed at the site 29°12'32.0"S 31°01'50.0"E.


Projects

James Kleynhans WTW Phase 3
214
  • 33837
Construction and completion of the augmentation of James Kleynhans bulk water supply / water treatment works, Phase 3, in Makhanda, Eastern Cape. Value of the project: R223 363 000,17 . Scope of works: The augmentation of the existing WTW from 10ml/day to 20ml/day requires the construction, refurbishment


Projects

Maclear Water Treatment and Distribution Upgrade
366
  • 13899
Maclear Water Treatment and distribution upgrade. The project scope is as follows: 1. Aucamp Water Works emergency rehabilitation (multi-disciplinary for immediate attention to health related matters), 2 Maclear (Aucamp) raw water augmentation: Abstraction. Pump station & pump equipment. Rising main.


Projects

Thapane RWS Phase 3
102
  • 27452
Upgrading and extension of the Thapane Regional Water Scheme Phase 3 in the Mopani District Municipality, Limpopo. CIDB 7CE The GPS location is unknown, the marker has been placed at the Mopani Muncipal offices in Giyani 23°18'47.8"S 30°42'36.9"E


Projects

Vaalwater WWTW
107
  • 33220
Upgrading and expansion of the Vaalwater waste water treatment works in Vaalwater, within Modimolle-Mookgophong Local Municipality, Limpopo. The proposed upgrade shall entail establishment of a new treatment plant and associated infrastructure with a design capacity of 11ML per day. The GPS location


Projects

Ledwaba, Mmakotse & Motantanyane WS, Phase 1 Contract D
137
  • 33606
Construction of Ledwaba, Mmakotse and Motantanyane villages water supply Phase 1, Contract D in Limpopo. Contract value R46 223 960.00 The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station 24°18’29.31”S 29°29’14.19 “E.

Advertising

Send me a Sample Based on these search results