Construction and maintenance of the Umdloti & Umkomaas sewerage treatment plants in the Ethekwini Metropolitan Municipality, KwaZulu-Natal. The scope for the Umdloti STP could include decommissioning of the four existing STPs at Genazzano, Umdloti, Verulam and King Shaka International Airport STPs, construction
Construction of new service building at Strandfontein West water treatment plant situated in Strandfontein, Cape Town, Western Cape. The project value is R 12 462 428,33. The GPS co-ordinates are 34°04'15.7"S 18°32'36.0"E
Lesotho Highlands Water Project 2024 shutdown outage, inspection and repairs of Delivery Tunnel North (DTN) and erosion protection to Ash River - (6 month shutdown), the project is located on the outskirts of Clarens in the Free State. Project Value: R357 822 994,69. The scope of work includes site establishment
Expansion and refurbishment of the Acornhoek waste water treatment works in Acornhoek, Mpumalanga. CIDB 7CE. The GPS marker has been placed at the Acornhoek waste water treatment works 24°37'20.6"S 31°04'13.9"E
Upgrading, repair and maintenance of the Nandoni water treatment works, in Thohoyandou, Limpopo. CIDB 9CE. The objective is to construct a new module, with a capacity of 60Ml/d to increase the overall plant capacity to 120Ml/d. The GPS coordinates are 22°58'19.1"S 30°35'58.9"E
Refurbishment of the water pre-treatment plant at Kriel Power Station located in Ga-Nala, Mpumalanga. CIDB 7CE/7ME. Scope of works could include but not limited to pre-treatment clarifiers, sandfilters and backwash system. The GPS marker has been placed at the power station 26°15'11.7"S 29°10'36.8"E
Construction of Greater Mnqumeni water supply scheme phase 6.1 in the Harry Gwala District Municipality, Umzimkhulu, KwaZulu-Natal. CIDB 8CE. Scope of works: Construction of a new 1000kl clear water reservoir at the Mnqumeni WTW, new pump station at the WTW, new 2 700m rising main from the Mnqumeni
Construction works for the water upgrades earmarked for the Foresthill tower and pumpstation located on Erf 68, Turffontein, 418 Rifle Range Road, Turffontein, Johannesburg, Gauteng. CIDB 8CE. Scope of works is to enhance the storage capacity of the existing water works at Foresthill in Johannesburg
Upgrading of the Hartswater bulk water supply located in Hartswater, Northern Cape. CIDB 8CE/7ME. Scope of works could include but is not limited to: construction of a new 800m long rising main pipeline from the WTW to main reservoir site, a new 1400m long rising main pipeline from the WTW to the Langeberg
Construction works for the stormwater system upgrades in Ramotse 1A, 1C and AF, Ramotse, Gauteng. CIDB 7CE. The scope of works entails the following: 2674m of Trapezoidal concrete canal (M01 – M08), 54m of rectangular shape channel divided into three barrels (M04), 1495m of rectangular concrete canal