Construction of the Enzondwane Domestic Reticulation in eNzondwane, Mandlakazi, Zululand District Municipality, KwaZulu-Natal. Value of R46 276 313.20. The scope consists of construction of 70km reticulation network with pipe diameters between 20mm to 90mm (HDPE), 110mm to 200mm (oPVC), and 600 yard
Construction of the HEWU RA60 Regional Water Supply Scheme: Sada water treatment works augmentation, Sada Township, Enoch Mgijima Local Municipality, Chris Hani District Municipality, Queenstown, Eastern Cape. Value of the project: R83 786 175.57. The exact GPS location is not known and the Marker has
Refurbishment of a 40ML reservoir at Point D and associated works located in the Emalahleni Local Municipality, Mpumalanga. CIDB 7CE. The scope of works involves but not limited to the following: repairs of structural cracks on the reservoir, replacement of all associated reservoir isolating valves,
Refurbishment of the Thabazimbi wastewater treatment works on portion 5, Farm Donkerpoort 344 KQ, Thabazimbi Local Municipality in Limpopo. CIDB 7 CE. The GPS marker has been placed at the Thabazimbi WWTW 24°36'25.2"S 27°23'15.8"E
Upgrading of extension 32, 33 and 34 sewer reticulation network in Ermelo, Mpumalanga. CIDB 8CE. The exact GPS coordinates are unknown but the marker has been placed at the municipality 26°31'40.8"S 29°59'19.1"E
Construction of the secondary bulk pipeline from Nikhwe to Redoubt, 5Ml and 2.2Ml concrete reservoirs located near the Bizana Reservoir, Eastern Cape. The project value is R 67 787 000,70. The exact GPS location is not known and the marker has been placed at the Mbizana Local Municipality, 30°51'01.0"S
Construction and commissioning of civil, mechanical and electrical works for Phase 2 of the Sterkfontein Regional Water Treatment Works in Sterkfontein between Harrismith and QwaQWa, Free State. Estimate value: R114 195 265.22. Approximate GPS coordinates: -28.383114, 29.012678.
Refurbishment and replacement of asbestos cement pipes (AC) to HDPE in the urban areas of Mokopane, Church Street to Tin Street, in the Local Municipality of Mogalakwena, Limpopo. Project Value: R34 876 387.38. The exact GPS location is not known and the Marker has been placed at Mogalakwena Local Municipality
Installation of supply line and water reticulation for 770 stands at Ha-Sethunya in the Free State. Project value: R42 945 234,20. GPS coordinates have been placed at the start of the construction area 28°34'59.4"S 28°49'48.6"E
Construction of the Maluti Ramohlakoana bulk water supply Phase 2, Contract 2 at Matatiele, Eastern Cape. Value of the project: R36 206 624.34 Phase 2, contract 2 entails the construction of bulk rising main and gravity main pipelines terminating at existing 2,5Ml and the proposed 5Ml and the gravity