Construction of the Phongolo River Tributary Bridge no.4031 and road approaches on District Road D9 in Phongolo, KwaZulu-Natal. CIDB 8CE. The scope of work could include the upgrade of road approaches on District Road D9 between km 1.400 and 2.120. The GPS marker has been placed on the Road D9 27°27'03.6"S
Construction of upper Mhlahlane ext water supply and completion of a pumpstation at Mhlahlane WTW and 1Ml command reservoir, O.R. Tambo District Municipality, Mthatha, Eastern Cape. Project Value: R24 390 750.89. Scope of works: Construction of pumpstation building, 1ML reinforced concrete reservoir,
Installation of internal services for 2 lots of 500 stands, Project A & B at Boitekong Extension 39, also known as Popo Molefe in Rustenburg Local Municipality, North West. CIDB 7CE. Scope of works could include: stabilisation of gravel roads, storm water control, erosion protection, water supply and
Construction of the bulk sewer lines and pump stations for Mokhesi next to Sterkspruit as part of the RBIG Project in the Eastern Cape. Estimated value: R69 894 840.09. The GPS is placed at the Sterkspruit Water Treatment Works, 30°31'50.0"S 27°21'21.5"E.
Construction of the HEWU RA60 Regional Water Supply Scheme: Bushmanskrantz water treatment works augmentation, Lukanji, Chris Hani District Municipality, Eastern Cape. Value of the project: R105 231 460.23. The exact GPS location is not known and the Marker has been placed at Bushmans Krantz Dam: 32°20'45.7"S
Construction of Phase 1 for the return effluent distribution water infrastructure to Zones 3, 5, 6, 7 and 9 of the Coega SEZ in Port Elizabeth, Eastern Cape. CIDB 8CE. The extent of the planned works entails the construction of new RE pipelines and ancillary works. The GPS marker has been placed in Zone
Construction of a 6.6km, 4.5mm thick, Grade X42, continuously welded steel gravity main load shift pipeline from Blackburn to Phoenix in Ward 102, 35 & 48 in Durban North, eThekwini Municipality, KwaZulu-Natal. CIDB 8CE. The proposed pipeline traverses along wards 35, 102, and 48 within the North Operational
Construction of the secondary bulk pipeline from Nikhwe to Redoubt, 5Ml and 2.2Ml concrete reservoirs located near the Bizana Reservoir, Eastern Cape. The project value is R 67 787 000,70. The exact GPS location is not known and the marker has been placed at the Mbizana Local Municipality, 30°51'01.0"S
Construction of Mampuru bulk water scheme, Phase 1B which relates to the pump station, Sekhukhune District Municipality, Groblersdal, Limpopo. Project Value: R24 777 279.00. Pumpstation Implementation entails the construction of the following elements: Site clearance and excavation, pumpstation building,
Replacement of the asbestos pipeline from Pieterskraal-B to Wolveskraal reservoir in Madlayedwa, Mpumalanga. Value of R25 545 317,10. Scope of works: replacement of asbestos pipes of approximately 9.5km from Marothobolong village (V3 reservoir), Pieterskraal-B to Wolwekraal and to Maphotla village. The