You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 2416 items with Total of 2599 results

Advertising



Projects

Phongolo Tributary Bridge & D9
0
  • 36112
Construction of the Phongolo River Tributary Bridge no.4031 and road approaches on District Road D9 in Phongolo, KwaZulu-Natal. CIDB 8CE. The scope of work could include the upgrade of road approaches on District Road D9 between km 1.400 and 2.120. The GPS marker has been placed on the Road D9 27°27'03.6"S


Projects

Mhlahlane 1Ml Command Reservoir
157
  • 33742
Construction of upper Mhlahlane ext water supply and completion of a pumpstation at Mhlahlane WTW and 1Ml command reservoir, O.R. Tambo District Municipality, Mthatha, Eastern Cape. Project Value: R24 390 750.89. Scope of works: Construction of pumpstation building, 1ML reinforced concrete reservoir,


Projects

Boitekong Extension 39
113
  • 36056
Installation of internal services for 2 lots of 500 stands, Project A & B at Boitekong Extension 39, also known as Popo Molefe in Rustenburg Local Municipality, North West. CIDB 7CE. Scope of works could include: stabilisation of gravel roads, storm water control, erosion protection, water supply and


Projects

Sterkspruit Pumpstation
152
  • 31634
Construction of the bulk sewer lines and pump stations for Mokhesi next to Sterkspruit as part of the RBIG Project in the Eastern Cape. Estimated value: R69 894 840.09. The GPS is placed at the Sterkspruit Water Treatment Works, 30°31'50.0"S 27°21'21.5"E.


Projects

HEWU RA60 RWSS: Bushmanskrantz
168
  • 34033
Construction of the HEWU RA60 Regional Water Supply Scheme: Bushmanskrantz water treatment works augmentation, Lukanji, Chris Hani District Municipality, Eastern Cape. Value of the project: R105 231 460.23. The exact GPS location is not known and the Marker has been placed at Bushmans Krantz Dam: 32°20'45.7"S


Projects

Coega RE System for Zones 3, 5, 6, 7 and 9
136
  • 35868
Construction of Phase 1 for the return effluent distribution water infrastructure to Zones 3, 5, 6, 7 and 9 of the Coega SEZ in Port Elizabeth, Eastern Cape. CIDB 8CE. The extent of the planned works entails the construction of new RE pipelines and ancillary works. The GPS marker has been placed in Zone


Projects

Blackburn Steel Gravity Main
132
  • 35463
Construction of a 6.6km, 4.5mm thick, Grade X42, continuously welded steel gravity main load shift pipeline from Blackburn to Phoenix in Ward 102, 35 & 48 in Durban North, eThekwini Municipality, KwaZulu-Natal. CIDB 8CE. The proposed pipeline traverses along wards 35, 102, and 48 within the North Operational


Projects

Bulk Pipeline from Nikhwe to Redoubt
131
  • 31676
Construction of the secondary bulk pipeline from Nikhwe to Redoubt, 5Ml and 2.2Ml concrete reservoirs located near the Bizana Reservoir, Eastern Cape. The project value is R 67 787 000,70. The exact GPS location is not known and the marker has been placed at the Mbizana Local Municipality, 30°51'01.0"S


Projects

Mampuru BWS Phase 1B
136
  • 34495
Construction of Mampuru bulk water scheme, Phase 1B which relates to the pump station, Sekhukhune District Municipality, Groblersdal, Limpopo. Project Value: R24 777 279.00. Pumpstation Implementation entails the construction of the following elements: Site clearance and excavation, pumpstation building,


Projects

Pieterskraal to Wolveskraal Reservoir
131
  • 35726
Replacement of the asbestos pipeline from Pieterskraal-B to Wolveskraal reservoir in Madlayedwa, Mpumalanga. Value of R25 545 317,10. Scope of works: replacement of asbestos pipes of approximately 9.5km from Marothobolong village (V3 reservoir), Pieterskraal-B to Wolwekraal and to Maphotla village. The

Advertising

Send me a Sample Based on these search results