Construction of Phase 2 for the return effluent distribution water infrastructure to Zones 3, 5, 6, 7 and 9 of the Coega SEZ in Port Elizabeth, Eastern Cape. Value of R115 752 908,88. Scope of works could include but not limited to: pipe trench excavations, shoring and backfilling, supply and lay DN710,
Construction of a new greenfield and deep-water port with associated infrastructure as well as a new rail link connecting the port to the mining and industrial hubs in the Northern Cape. The GPS Coordinates have been placed at Boegoebaai 29°14'21.6"S 16°51'17.5"E
Construction of a 300Ml reservoir, bulk pipelines and associated infrastructure on Portion 5 of Farm Weltevreden No 719 and Portion 12 of Farm Herculus Pilaar No 475 near Muldersvlei, Western Cape. The project value is R1 520 110 178,00. The Muldersvlei reservoir and future water treatment works (phase
Construction of the spill dam and associated infrastructure at Transnet Pipelines Waltloo Depot, Pretoria, Gauteng. CIDB 7CE. The works involve the civil, structural, electrical, mechanical and piping installation for a new reinforced concrete spill basin. Refurbishment of an existing separator, pump
Upgrading of the Klapmuts wastewater treatment works, phase 1, located in Klapmuts, Western Cape. The project value is R 32 131 179,33. The GPS co-ordinates are 33°48'12.9"S 18°51'28.9"E.
Construction of the Umzimvubu Ward 14 water supply located in the Alfred Nzo District Municipality, Eastern Cape. CIDB 7CE. Scope of works could include but not limited to: refurbishment and repair of leaks to the existing reservoirs, upgrade the existing spring protection, upgrade 835m 75mm MPVC class
Construction of the Madibe A Tau water supply scheme project in Madibe, Mafikeng, Ngaka Modiri Molema District Municipality, North West. Contract value R53 500 417,10 The GPS coordinates are currently unavailable, we have temporarily placed the GPS marker at Sekolopo Middle School in Madibe -25.9455223,
Construction of Borakalalo water supply starting at the Motswedi water treatment plant, Borakalalo, Ngaka Modiri Molema District Municipality, North West. Value of R106 764 538.93. Scope of work includes: Refurbishment/upgrade of the Motswedi water treatment works (sand filter, air filter blowers, supply
Refurbishment of Mogwase waste water treatment works plant in Mogwase, Moses Kotane Local Municipality, North West. Contract value is R61 682 969,88 (incl Vat). The GPS marker has been placed at the WWTW plant 25°19'37.0"S 27°14'16.4"E
Construction works for the upgrading of the outfall sewer in Jouberton - Alabama, Phase 2 in Jouberton, Klerksdorp, North West. Value of R49 839 538.93. The site is situated between two prominent intersections from N12 to Jouberton and Alabama (Phuthaditshaba Street as well as Jabulani/ Buitekant Streets).