Construction of the civils and services for the North West Innovation Hub along the N12, Potchefstroom, North West. The development will be constructed on 20 hectares of land 6.2 hectares is zoned for business and 8.7 hectares zoned for commercial. It is anticipated that there will be 9 business units
Additions and alterations to the existing New Germany switch centre situated on the remainder of Lot 238, 3 Valley View Road, New Germany, KwaZulu-Natal. The GPS is -29.8054803048315, 30.8774812665256
Design and construction of a document building, fire and medical storeroom and secondary clarifier substation at Medupi Power Station, Lephalale, Limpopo. CIDB 8GB. The construction scope includes civil and structural elements (including architectural, geotechnical works, roads and paving, parking and
Construction of an ultra-modern mixed used shopping centre at plot 82659 Notwane grounds in Gaborone, Botswana. High Level Specifications: Notwane retail centre has several pieces designated for numerous uses including the following: Mixed use commercial, mixed use civic (2 x basement parking and commercial
Construction of new offices for Hollywood Bets in Richefond Circle, Ridgeside Office Park, uMhlanga, KwaZulu-Natal. The GPS marker has been placed at the location of the site 29°44'08.5"S 31°04'15.9"E
Construction of Hotel du Lac at Yaoundé Municipal Lake, Cameroon. The hotel building will have 30 storeys made up of 93 apartments with a total of 132 hotel rooms while the annex will have 17 storeys. There will also be a conference room, restaurants, a sky bar on the 24th floor with a terrace, two pools
Construction of the Mall Triton Tower New Capital on 2MCH+QX Cairo Governorate Desert, Egypt. Scope of works could include: A division of units into administrative, commercial, and medical units. An area dedicated to children will also be constructed as well as artificial lakes and large green spaces
Refurbishment of the 2 storey Eastern Cape Development Corporation (ECDC) office building and 2 x 4 storey face brick office blocks (Cluster E) located at 24 High Street, Butterworth, Eastern Cape. The project value is R 22 453 874,78. The scope of works includes: Demolition works of internal and external
Construction of works for the Jetpark Warehouse Phase 2 project located on 24 Kelly Road, Jet Park, Boksburg, Gauteng. The development spans 16 085m² and features two warehouses with offices on site. The development area will have truck access is 20m x 20m, private yard area. The GPS coordinates are
Refurbishment for the 36 Hans Strijdom Building located on Erf 155345, 36 Hans Strijdom Avenue, Cape Town City Centre, Cape Town, Western Cape. The scope of works involve construction of a new façade, relocate the parking entrance, install new lifts, new services to offices, demolish internal offices