Construction of the Zambia-Mozambique 400kV Power Interconnector Project. The Southern African Power Pool (SAPP) has received a grant from the African Development Bank to finance the project. The exact co-ordinates are currently not available however the approximate area of location is lat: -13.6445104;
Construction of the Kafue in Zambia to Lion’s Den in Zimbabwe railway spur. The exact co-ordinates are currently not available however the approximate area of location is lat: -15.770999811935704, long: 28.177277491511347
Construction of a 550 km interconnector transmitter to be known as the Mozisa Project for Zimbabwe, South Africa and Mozambique. Estimated total project cost will be US$ 342.2 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -19.883333; long:
The proposed development will consist of the 100 MW run-of-river Lower Orange Hydroelectrical Power Scheme (LOHEPS). The scheme will entail the development of up to nine small hydroelectric power stations, ranging from 6 MW to 12 MW, along the Lower Orange river, which has an estimated power generation
Construction of about 300 km of access roads to reach the hydroelectric plants will have to be built, as part of this proposed scheme. This proposed development will consist of the 100 MW run-of-river Lower Orange Hydroelectrical Power Scheme (LOHEPS). The scheme will entail the development of up to
The project will entail the treatment of stock-piled uranium through a dedicated uranium processing facility. The uranium will be mined concurrently with the mining of copper ore from within the existing Malundwe and Chimwungo pits and stockpiled in a dedicated facility. Lumwana is located in the North
Construction of 2 office buildings with a common, lower level covered parking, a separate parkade building, surface parking, roads and external works on portions 931, 932, 933, 947, 948 on Farm No. 2, Hhohho in Mbabane in Swaziland.
Estimated project cost for the entire project: E300 million.
Construction of a state of the art fresh produce export Terminal in Maputo port. The project is valued at R30 million and will have two major shareholders, Port Elizabeth Cold Store and a Mozambican company, Fidelity Investments. This facility will be able to handle 70,000 tons of citrus in a six month
Construction of internal roadways and associated bulk service infrastructure for the proposed Skeleton Coast Golf Development which will include a nine hole Links Golf course with several tee off positions thus affording a full 18 holes; 43 single residential stands; two large general residential sites;